Amid the industrial park landscape filled with concrete structures and long stretches of factory buildings, the A1A 2 Office stands out as a distinctive “green highlight” - where sustainable design solutions and synchronized construction capabilities are brought together in a project targeting LEED Silver certification.
As the Design & Build General Contractor, Ä¢¹½ÊÓÆµÍø maintains strict control over every construction item, ensuring that design and execution operate as one unified process. The A1A Project is currently recording a significant acceleration in construction progress during the finishing stage prior to handover:
• 100% completion of painting works, staircase granite installation, and glass railings
• 95% completion of concrete flooring works
• Tiling works are being implemented simultaneously, prioritizing lower floors to ensure seamless progress coordination
🌱 Green Building Highlights
• 70% of the façade is covered with glass, blurring the boundary between interior and exterior spaces
• Two symmetrical building blocks connected through a central open space allow the building to naturally “breathe” through ventilation and daylight
• Green spaces featuring water features, landscaping, and pedestrian walkways create a nature-inspired working environment within the industrial park